Publication date: 24-Apr-2023
The assignment consists in conducting technical due diligence for a 30 MW Solar PV Project with storage in N’Djamena in Chad developed as an Independent Power Producer (IPP).
Allowed file: pdf,zip,doc,docx, maximum upload file size: 512M
Enter the destination URL
Or link to existing content