The Global Green Growth Institute (GGGI) is a treaty-based international, inter-governmental organization dedicated to supporting and promoting strong, inclusive and sustainable economic growth in developing countries and emerging economies. To learn more please visit about GGGI web page.
Kiribati is a founding member of GGGI. Together, the Government of Kiribati and GGGI have been working to address targeted needs in green growth, climate adaptation and mitigation, sustainability, low-carbon, and development. GGGI seeks to complement the Government objective of the Kiribati National Vision 2016-2036 and works across a few sectors in Kiribati including climate-smart agriculture, renewable energy, green-preneurship and green business development, climate finance access and absorption. In partnership with the Ministry of Finance and Economic Development, GGGI has been embedded in the Climate Finance Division (CFD) through the Climate Finance Access Network (CFAN) program to support green and climate finance mobilization and pipelines development through a demand driven process from a wide range of stakeholders in line with green growth and climate change priorities and targets of the Government of Kiribati.
The Public Utility Board (PUB) of Kiribati is the electricity, water supplier and sewerage disposal for Kiribati and services the main center of South Tarawa. PUB is a corporate body, established under the Public Utilities Ordinance, Cap 83, on 1st July 1977 and which was further amended in 2000 to allow for more autonomy in its operations. In 2013 PUB became a State-Owned Enterprise with an established Board of Directors as part of its governance structure.
One of PUB’s current pipeline priorities is to support their efforts to stabilize the national grid servicing South Tarawa through the provision of Battery Energy Storage Systems (BESS) to six sites which have Solar PV grid connect systems in place, but do NOT have a battery storage system. It is estimated that a total of 1,6280kW is the current combined capacity of the solar PVs for all six sites located on Betio, Bairiki, Bikenibeu and Nawerewere (KGV, TCH, KIT, BSC, PEC, FPV). BESS was not initially factored in due to the excessive costs of BESS and the limited capacities/capabilities within PUB to operate and manage BESS systems. GGGI is recruiting an Energy Consultant to conduct a pre-feasibility study to develop a business case for BESS integration and examine its viability and bankability to support the grid stabilization for South Tarawa in Kiribati. The consultant will work closely with MISE, PUB, GGGI and Climate Finance Division (MFED) to deliver this assignment.
The assignment aims to conduct overall technical and financial assessment of PUBs existing Solar PV grid connect systems, for the 6 sites identified. A pre-feasibility report will be compiled as result of the consultancy, which will enable a better understanding of the status of PUB’s Solar PV grid connect system and the addition of the complementary BESS.
The consultancy will work closely with PUB in collecting the relevant data and information based on the 6 sites selected for this project and assess the pre-feasibility nature in accordance with the deliverables required. The consultant may refer to national documents for contextual purposes, however the design and technical recommendations must be established through analysis and assessments guided by this assignment.
Key reference documents which may support the consultants’ assessment may be in reference to the following documents:
The documents delivered through this assignment will serve as reference documents for all stakeholders involved in the implementation of NDC activities in the energy sector. They will also be used for establishing contacts with potential support providers to leverage climate finance and support for NDC implementation.
To develop the scope for a renewable energy and energy storage project in the future, a Renewable Energy Consultant is needed to undertake a pre-feasibility study. Specifically the consultant will collect data to ensure understanding of the existing systems in place and additional carrying capacity for the proposed Battery Energy Storage Systems; propose optimal system design options, including: a) PV+BESS+ facility for BESS systems for the 6 sites or b) BESS connected with facility to 6 sites; assess the required space; environmental and social impacts; and cost estimates.
The consultant is required to conduct 4 tasks over a period of 3 months and to work closely with the PUB, MISE, GGGI (GIS and CFAN Advisor) and the Regional Technical Lead.
Task 1: Project initiation and data collection
The consultant will start an inception phase in consultation with GGGI, PUB and MISE. The scope and objectives of the assignment will be discussed, challenges and issued shared to provide context for the assessments.
The consultant is required to prepare a desktop review which includes an analysis of policy and regulatory frameworks related to renewable energy generation and consumption use, and storage capacity in the Kiribati context to identify any regulatory barriers to the success of the project and suggest practical solutions
The consultant will prepare a detailed workplan, questionnaires to be used, and planned workplan which will be used in the consultations conducted in Kiribati. The consultant is required to visit all 6 sites identified under this project. A consultant will undertake a desktop study, guided by PUB, including a review of data related to grid performance, load patterns, Load Profile Analysis: Peak Load and Load Growth Projections, to provide analyses for daily, seasonal, and annual load profiles and growth projections over 5, 10, and 20 years. To ensure the system is sized accurately from the start, voltage fluctuations and frequency variations are referencing previous studies commissioned by the PUB in support of this work.
Deliverable 1 – Inception report, Barrier analysis, Site Survey report and workplan
Task 2 – Technical pre-feasibility assessment
The consultant shall conduct a full pre- feasibility study to assess the fundamental support systems needed to enable the addition of BESS to the existing grid. The study should provide a clear understanding of the current state of 6 sites in terms of Solar PV and BESS potential, identify gaps and constraints, and propose well-defined, practical, and technical solutions/recommendations for BESS installation and grid stabilization and reliability.
The consultant will assess the following areas:
Technical Elements for consideration as part of the pre-feasibility study:
Battery energy storage system (BESS) optimizations:
Reactive Power Management Systems:
Power System Analysis and Fault Location Optimizations:
Control Systems for Effective SCADA Management:
Environmental and social impacts assessment:
Deliverable 2 – Pre- feasibility study including an assessment for an integration of BESS for grid stabilization including social and environmental safeguards concerns and GHG emission reduction potential
Task 3 – Prepare detailed technical specification of the system and total cost estimate of the project
The consultant must provide detailed technical specifications of the proposed system and a cost estimate. This could include the following items: solar PV modules, battery modules, charge controller, inverter, support structure, array stands, and where such system can be sought; logistical cost, installation cost, and operation cost. The deliverables required will consist of a consolidated financial portfolio estimate and technical design, supply, and installation specifications
Deliverable 3 – Report on detailed technical specifications and financial portfolio estimates
Task 4: Validation meeting and Final report
The consultant will be expected to provide a Final Report at the end of the assignment, which would include an overview of the process undertaken, recommendation and proposed roadmap for advancing the development of the full project, including identification of suitable sources of finance. The final report will include all deliverables as in an annex.
Deliverable 4 – Final report (including results from Task 2, Task 3, and Task 4) and PowerPoint Presentation slides deck for presentation at the validation meeting.
Deliverables will be in accordance with the Project Work plan timeline.
Deliverables | Timetable | Payments for fees subject to acceptance of deliverable by GGGI |
Inception report, methodology and workplan
(Deliverable 1) |
2 weeks after commencement | 20% |
Draft technical assessment report; costing and detailed specifications (Deliverable 2, 3) | 12 weeks after commencement | 50% |
Final report (Deliverable 4) and PowerPoint presentation slides deck | 15 weeks after commencement | 30% |
The Renewable Energy Consultant must:
The Renewable Energy Consultant will ensure:
Date to close is Korean Standard Time (11.59PM KST). Applications submitted after the deadline will not be considered Application. Cover Letter, and CV must be sent in English. A consortium, or a firm may not be engaged for the individual consultant assignment.
Child protection – GGGI is committed to child protection, irrespective of whether any specific area of work involves direct contact with children. GGGI’s Child Protection Policy is written in accordance with the Convention on the Rights of the Child.